Wiley-Blackwell, 2004. — 245 p.
The lean procurement techniques given in this practical guide could save clients up to 40% of total design and construction costs; case history evidence is included to prove that the techniques really work. The guide goes on to explain in equal depth the lean construction techniques that supply-side design and construction firms (including trades contractors) need to adopt to deliver the savings while boosting their profit margins.